Sunday, September 2, 2018

Imperial Cathedral: 2 September 2018




Worked on some little plastic strips (the white ones in the lower picture) to which the roof will attach. These secure in place with pins fitting into sockets drilled into the gray cones, but I may have to replace them with magnets or drill the holes out wider so they can be fitted in place easier.

=][= Danforth Laertes

No comments:

Post a Comment