Saturday, September 1, 2018

Imperial Cathedral: 1 September 2018



Using practical geometry (I have pictures of the process and will post them on my other blog) I cunningly cut a piece of PVC pipe so it fitted over the roofline with an acceptable level of tightness. Huzzah!

=][= Danforth Laertes

No comments:

Post a Comment